Anyone have a contractor that builds garages they'd recommend. We are outside Stewiacke so we likely could use HRM or Truro based ones. Looking for a rough quote to give us an idea what we'd spend to build something similar to this: www.thegarageplanshop.com/028g-0052.phpWe'd be looking at not having the RV bay drive thru and have the back flush and push the front out further. That way we could extend the back of the roof to create a covered "car port" like area to store tractor implements out of the rain and sun.
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Dec 31, 2013 11:02:36 GMT -4
That's very similar to a design I did 5 or 6 years ago for a client in Ontario. We put the stairs along the side to reduce the span of the floor system. Without having a beam and posts, the heaviest duty 16" open web floor truss will only give you a 27' clear span (at 16"o/c).
|
|
|
Post by ©Big6™ on Dec 31, 2013 11:18:08 GMT -4
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Dec 31, 2013 12:01:37 GMT -4
i work as a estimator for a home install division working out of a home hardware building center here in the annapolis valley, check out this site: www.homehardware.ca/en/index/home-projects/backyard-projects/garages/rv-garages/rv-garage-30-x-36.htmwe employee our own carpenters and would build this on site for $39,700.00 plus tax. Thats a roof tight package with a 4ft frost wall foundation, 4" poured floor, 2x6 framing, vinyl siding and one piece laminate shingles, does not include excavation, perimeter drainage, electrical, interior finish or trim, and no electrical garage doors openers. We dont travel as far away as you, so we cant come built this project for you, but atleast gives you some insight as to what to aspect from someone local.
|
|
kilo69
Jeeper
Coldstream Explorer
Posts: 1,528
|
Post by kilo69 on Dec 31, 2013 12:37:09 GMT -4
That's very similar to a design I did 5 or 6 years ago for a client in Ontario. We put the stairs along the side to reduce the span of the floor system. Without having a beam and posts, the heaviest duty 16" open web floor truss will only give you a 27' clear span (at 16"o/c). Good to know about the span. I wasn't too worried about the post between the small bays and large bay as we plan to use the small ones as parking and do all my work/tinkering in the large bay. But if moving things a bit gives a larger open floor plan then it might be worth taking a look!
|
|
kilo69
Jeeper
Coldstream Explorer
Posts: 1,528
|
Post by kilo69 on Dec 31, 2013 12:40:06 GMT -4
i work as a estimator for a home install division working out of a home hardware building center here in the annapolis valley, check out this site: www.homehardware.ca/en/index/home-projects/backyard-projects/garages/rv-garages/rv-garage-30-x-36.htmwe employee our own carpenters and would build this on site for $39,700.00 plus tax. Thats a roof tight package with a 4ft frost wall foundation, 4" poured floor, 2x6 framing, vinyl siding and one piece laminate shingles, does not include excavation, perimeter drainage, electrical, interior finish or trim, and no electrical garage doors openers. We dont travel as far away as you, so we cant come built this project for you, but atleast gives you some insight as to what to aspect from someone local. Well that is a good to know even if we can't use your builders. We were discussing going with metal roof and siding since we have a windy property and shingles don't hold up over time. Although that's something I feel I can do myself it's more the slab and framing and clading the roof and walls.
|
|
eastcoastcam
Jeeper
Is it time to go wheeling yet??
Posts: 1,690
|
Post by eastcoastcam on Dec 31, 2013 13:13:47 GMT -4
Ramar Renovations 877-4958, that will put you in touch with Steve Costard, our renovations guy.
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Dec 31, 2013 13:52:42 GMT -4
i work as a estimator for a home install division working out of a home hardware building center here in the annapolis valley, check out this site: www.homehardware.ca/en/index/home-projects/backyard-projects/garages/rv-garages/rv-garage-30-x-36.htmwe employee our own carpenters and would build this on site for $39,700.00 plus tax. Thats a roof tight package with a 4ft frost wall foundation, 4" poured floor, 2x6 framing, vinyl siding and one piece laminate shingles, does not include excavation, perimeter drainage, electrical, interior finish or trim, and no electrical garage doors openers. We dont travel as far away as you, so we cant come built this project for you, but atleast gives you some insight as to what to aspect from someone local. Well that is a good to know even if we can't use your builders. We were discussing going with metal roof and siding since we have a windy property and shingles don't hold up over time. Although that's something I feel I can do myself it's more the slab and framing and clading the roof and walls. I do alot of construction work after hours and i can tell you if your handy enough and have some friends, you should be able to put that garage up ive quoted you for around 30% less
|
|
|
Post by 540rock on Dec 31, 2013 18:37:58 GMT -4
I built my garage 4 years ago. I bought almost everything from stewiacke home hardware. It's a 40x50 16" ceiling. 100% finished was 48 grand. A lot more work than I ever thought it would be, But love it.
|
|
kilo69
Jeeper
Coldstream Explorer
Posts: 1,528
|
Post by kilo69 on Jan 2, 2014 12:38:51 GMT -4
I built my garage 4 years ago. I bought almost everything from stewiacke home hardware. It's a 40x50 16" ceiling. 100% finished was 48 grand. A lot more work than I ever thought it would be, But love it. That sounds quite large! How long did it take to build it?
|
|
|
Post by 540rock on Jan 7, 2014 10:01:51 GMT -4
I built my garage 4 years ago. I bought almost everything from stewiacke home hardware. It's a 40x50 16" ceiling. 100% finished was 48 grand. A lot more work than I ever thought it would be, But love it. That sounds quite large! How long did it take to build it? 4months almost every day. I had a 15 year old helper and friends on the weekends. Good thing my friends work for beer
|
|
|
Post by crazyfrog on Jan 7, 2014 10:12:46 GMT -4
Gerald Mitchell Contracting call Margie 401 6462
|
|
kilo69
Jeeper
Coldstream Explorer
Posts: 1,528
|
Post by kilo69 on Jan 7, 2014 12:30:47 GMT -4
|
|
|
Post by crazyfrog on Jan 7, 2014 17:35:36 GMT -4
Frank your uncle lol my wife is the office Manager small world
|
|
kilo69
Jeeper
Coldstream Explorer
Posts: 1,528
|
Post by kilo69 on Jan 8, 2014 14:19:31 GMT -4
Frank your uncle lol my wife is the office Manager small world Yeah he is, it is a small world! I forgot he worked there until I was browsing the website and saw his mugshot haha
|
|